Design and Development of Data Collection Platform with Mendix

Data collection platform.

2

Months to MVP

Design through development, delivered inside sixty days.

10/10

Net Promoter Score

What the client gave us at the end of it.

The client

Colleagues reviewing an analysis on screen.

A major global consulting group, specialising in transforming technology and data platforms for organisations worldwide, joined forces with Netguru on a platform for gathering data, built for an end client in the Middle East.

That client needed to collect, manage and deliver precise — sometimes sensitive — information at scale, on time, in an environment it fully controls. The subject was progress against the United Nations Sustainable Development Goals.

The challengeWhat the teams actually needed

The goal was an MVP built as quickly as possible, to show the platform could take the friction out of collecting this data at all.

Challenge 01A timeline measured in weeks

The window was short enough to rule out building everything from scratch, which is why the team went to a low-code platform.

Challenge 02Sensitive data, controlled environment

Precision mattered, and so did keeping the data inside an environment the end client fully controls.

Challenge 03Five people, start to finish

A senior product designer, two developers, a QA specialist and a project manager covered design through delivery.

What we did

Low-code, so two months was enough

Design ran first, then development picked up the initial designs and built against them, testing continuously.

Area 01 · Architecture

Design

The dashboard mapped out

A high-level outline of the dashboard’s architecture came first, alongside the user journeys through it.

Area 02 · Design

Product design

Wireframes and a style guide

Wireframe views of the dashboard, plus a style guide setting out the design principles the build would follow.

Area 03 · Build

Mendix

Input, requests, monitoring

Developers set up the environment and added the dashboard functions: data input, requesting data from specific users, and monitoring what had been collected.

Area 04 · Quality

QA

Tested as it went

Continuous testing throughout the build rather than a pass at the end, which is what made the sixty-day MVP hold together.